Live survey304 models · 14 providers · 22,792 auditsAudited grill-with-docs · SAFE →What changedHow we verifyllms.txt

Agent skill · Audited from source

Technical Construction Planning Report Writing

skill · ECNU-ICALK/AutoSkillLicence not declaredAudited 14 Oct 2026 · source 04e912cff54b

★ 602pushed 157 days agoversion 0.1.0
✓SAFEGrade B · 89/100 · 14 Oct 2026 · 04e912c
602repo stars · whole ECNU-ICALK/AutoSkill

Is it safe? Yes — SAFE, grade B (89/100). We read this skill's source at commit 04e912cff54b and found no filesystem, network or shell access and no hard-coded secrets. What it does: Generates the 'Construction Planning and Project Management' section of a technical report, focusing on construction sequence and schedule with specific constraints on tone, content focus, and appendix references.

Ask an AI about this pageGChatGPTCClaudePPerplexityGeGeminiXGrok
More
Cite

Cite this page

ModelsAtlas. “Technical Construction Planning Report Writing (ECNU-ICALK/AutoSkill)”. Retrieved 14 Oct 2026. https://modelsatlas.com/skills/ecnu-icalk/technical-construction-planning-report-writing

Trust audit

Audit 0.4.1 · source read 14 Oct 2026

Trust score89/100✓SAFE B
0 critical0 high0 medium0 low0 info

SAFE means nothing in the source contradicts what the skill says it does. Grade B is shared by 16,667 of 17,602 audited skills.

What the source does

  • FilesystemNone observedNo reads or writes in the source
  • NetworkNone observedNo outbound calls in the source
  • ShellNone observedNo commands run in the source
  • DependenciesPinnedNothing floats
  • SecretsNone foundNo keys in source

Five audit layers

LayerWhat we checkResultFindings
L0 ProvenanceRepo owner, licence, archive status, activityPASS0
L1 Static sourceSecrets, path traversal, supply chain, hidden codeNA0
L2 InstructionsPrompt injection, authority framing, hidden directivesPASS0
L3 InventoryThe files and declarations match the sourcePASS0
L4 SandboxRun in isolation and watch behaviourSKIPPED why0

Gates applied: no behavioural pass.

Findings (0)

No findings at any severity. We re-audit when the source changes.

Audit 0.4.1 · source sha 04e912cff54b · 14 Oct 2026Report an issue or request a re-scan

Provenance

Who published it, and what the verdict is pinned to

What it tells the agent

Full source on GitHub ↗

Its description: Generates the 'Construction Planning and Project Management' section of a technical report, focusing on construction sequence and schedule with specific constraints on tone, content focus, and appendix references.

---
id: "331f87db-6876-4311-bd10-32006c726c1e"
name: "Technical Construction Planning Report Writing"
description: "Generates the 'Construction Planning and Project Management' section of a technical report, focusing on construction sequence and schedule with specific constraints on tone, content focus, and appendix references."
version: "0.1.0"
tags:
  - "technical writing"
  - "construction management"
  - "report generation"
  - "project scheduling"
  - "wbs"
  - "gantt chart"
triggers:
  - "write the construction planning and project management section"
  - "construction sequence and schedule report"
  - "technical report for construction project"
  - "explain construction sequencing in a report"
  - "write a detailed construction schedule narrative"
---

# Technical Construction Planning Report Writing

Generates the 'Construction Planning and Project Management' section of a technical report, focusing on construction sequence and schedule with specific constraints on tone, content focus, and appendix references.

## Prompt

# Role & Objective
You are a Technical Report Writer specializing in Construction Planning and Project Management. Your task is to write the 'Construction Planning and Project Management' section of a technical report, specifically focusing on the construction sequence and schedule.

# Communication & Style Preferences
- Use a technical, professional, and objective tone.
- Avoid flowery language, metaphors, or overly artistic descriptions (e.g., do not use phrases like 'intricate dance').
- The writing should be detailed, lengthy, and comprehensive, using full paragraphs rather than bullet points for the main narrative.

# Operational Rules & Constraints
1. **Structure**: Write the content in detailed paragraphs.
2. **Appendix References**: Explicitly state that the Work Breakdown Structure (WBS) and the Gantt Chart are included in the appendix for detailed reference.
3. **Sequencing Logic**: Focus on explaining the logic and dependencies behind the construction sequence. Explain *why* specific activities are sequenced before others (e.g., foundational requirements, material procurement logic).
4. **Duration Handling**: Do not list specific durations for every task. Mention durations only for key activities or critical milestones to provide context without overwhelming the reader with a schedule list.
5. **Content Flow**: Ensure the narrative flows logically from site preparation and procurement through main construction activities (e.g., breakwater, wharf) to quality control and commissioning.

# Anti-Patterns
- Do not use bullet points for the main construction sequence description; use paragraphs.
- Do not use poetic or metaphorical language.
- Do not provide a simple list of tasks and durations; synthesize them into a narrative explaining the project flow.

## Triggers

- write the construction planning and project management section
- construction sequence and schedule report
- technical report for construction project
- explain construction sequencing in a report
- write a detailed construction schedule narrative

Excerpt, first 3,100 characters of SKILL.md, verbatim from the audited commit. It is text from someone else’s repository, quoted so you can judge it before your agent reads it.

Install

Pinned to the audited commit 04e912c

Download folder ↗
git clone https://github.com/ECNU-ICALK/AutoSkill
git -C AutoSkill checkout 04e912cff54b

The author documents no install command, so this uses the repository directly. Our verdict covers commit 04e912cff54b only.

Works in

The author has not said which agents this skill supports, and we have not tested it in any.

Audit history

Every audit, every source change

  1. ✓SAFE B 89 / 100

    first audit · source 04e912cff54b

Questions about Technical Construction Planning Report Writing

What does the Technical Construction Planning Report Writing skill do?
AutoSkill: Experience-Driven Lifelong Learning via Skill Self-Evolution
Is Technical Construction Planning Report Writing safe to install?
The audit found nothing in the source that contradicts what it says it does, and graded it B (89/100). Grade A is held back for packages that have also passed a sandboxed behavioural run, which is why a clean skill reads B.
What can Technical Construction Planning Report Writing access on my machine?
The audit observed no filesystem, network or shell use at all in its source.
How current is this page?
The grade is for one exact copy of the source (04e912cff54b), read on 2026-10-14. The repository is watched, and a new audit runs when it changes — this is the first audit.

Sources

Spotted something wrong? Report a correction · Methodology

Keep going in your AI

Opens with this page as the source. We add nothing else to the prompt.