Agent skill · Audited from source
Risk Scoring Matrix
skill · revfactory/harness-100Apache-2.0 licenceAudited 12 Oct 2026 · source 459e1bb8f76e
Is it safe? Yes — SAFE, grade B (89/100). We read this skill's source at commit 459e1bb8f76e and found no filesystem, network or shell access and no hard-coded secrets. What it does: risk assessment matrix and analysis tool. assessment-analyst agent risk probability and impact systematicas assessmentto do when reference. 'risk matrix', 'probability impact analysis', 'risk score' request when usage.…
Cite
Cite this page
ModelsAtlas. “Risk Scoring Matrix (revfactory/harness-100)”. Retrieved 12 Oct 2026. https://modelsatlas.com/skills/revfactory/risk-scoring-matrix
Trust audit
Audit 0.4.1 · source read 12 Oct 2026
SAFE means nothing in the source contradicts what the skill says it does. Grade B is shared by 17,406 of 18,389 audited skills.
What the source does
- FilesystemNone observedNo reads or writes in the source
- NetworkNone observedNo outbound calls in the source
- ShellNone observedNo commands run in the source
- DependenciesPinnedNothing floats
- SecretsNone foundNo keys in source
Five audit layers
| Layer | What we check | Result | Findings |
|---|---|---|---|
L0 Provenance | Repo owner, licence, archive status, activity | PASS | 0 |
L1 Static source | Secrets, path traversal, supply chain, hidden code | NA | 0 |
L2 Instructions | Prompt injection, authority framing, hidden directives | PASS | 0 |
L3 Inventory | The files and declarations match the source | PASS | 0 |
L4 Sandbox | Run in isolation and watch behaviour | SKIPPED why | 0 |
Gates applied: no behavioural pass.
Findings (0)
No findings at any severity. We re-audit when the source changes.
Audit 0.4.1 · source sha 459e1bb8f76e · 12 Oct 2026Report an issue or request a re-scan
Provenance
Who published it, and what the verdict is pinned to
- Publisherrevfactory GitHub userOwner of the repository this skill is read from
- Source folderrevfactory/harness-100/en/88-risk-register/.claude/skills/risk-scoring-matrixThe exact folder we audited
- LicenceApache-2.0As the repository states it
- Commit pinned for this verdict459e1bb8f76eA new audit runs when the source changes
- Repository statusNot archivedLast push 203 days ago
- Sandboxed runNot runSkills are read, not executed; layer L4 is skipped
What it tells the agent
Full source on GitHub ↗Its description: risk assessment matrix and analysis tool. assessment-analyst agent risk probability and impact systematicas assessmentto do when reference. 'risk matrix', 'probability impact analysis', 'risk score' request when usage.…
--- name: risk-scoring-matrix description: "risk assessment matrix and analysis tool. assessment-analyst agent risk probability and impact systematicas assessmentto do when reference. 'risk matrix', 'probability impact analysis', 'risk score' request when usage. However, insurance total risk model scope outside." --- # Risk Scoring Matrix — risk assessment matrix assessment-analyst agent risk /nature assessment tablelevel. ## 5x5 probability-impact matrix ### probability etc.grade | etc.grade | score | probability scope | description | |------|------|----------|------| | Low | 1 | <5% | occurrencedegree | | Low | 2 | 5~20% | possiblenature Low | | report | 3 | 20~50% | occurrenceto do number | | High | 4 | 50~80% | occurrence possiblenature High | | High | 5 | >80% | actual | ### impact etc.grade | etc.grade | score | schedule | cost | quality | scope | |------|------|------|------|------|------| | un- | 1 | <1week | <1% | un-un- | un-un- | | un- | 2 | 1~2week | 1~5% | daydepartment | daydepartment feature | | report | 3 | 2~4week | 5~10% | key | key feature | | each | 4 | 1~3month | 10~25% | beforequality | core feature | | valuepeople | 5 | >3month | >25% | usage impossible | project failure | ### risk score = probability × impact ``` impact 1 2 3 4 5 ┌───┬───┬───┬───┬───┐ 5 │ 5 │10 │15 │20 │25 │ 4 │ 4 │ 8 │12 │16 │20 │ rate 3 │ 3 │ 6 │ 9 │12 │15 │ 2 │ 2 │ 4 │ 6 │ 8 │10 │ 1 │ 1 │ 2 │ 3 │ 4 │ 5 │ └───┴───┴───┴───┴───┘ etc.grade: 🟢 1~4 Low | 🟡 5~9 report | 🟠 10~15 High | 🔴 16~25 ``` ## risk category classification (RBS) ### Risk Breakdown Structure ``` project risk ├── technical risk │ ├── technical │ ├── technical nature │ ├── integration issue │ └── nature/quality ├── management risk │ ├── schedule estimation │ ├── specialistKRW nature │ ├── scope change │ └── company ├── external risk │ ├── /grade │ ├── change │ ├── market │ └── environment/re- └── risk ├── personcapability ├── priority change ├── budget └── change ``` ## quality risk analysis ### EMV (Expected Monetary Value) ``` EMV = probability × impact(amount) : EMV = 30% × (-₩500M) = -₩1.500M opportunity: EMV = 40% × (+₩300M) = +₩1.200M project total EMV = Σ individual EMV → example(Contingency Reserve) calculation basis ``` ### also analysis (Tornado Diagram) ``` numberby impact scope (project cost standard): exchange ████████████████████ ±₩300M personcase ███████████████ ±₩2.200M delivery date degreeannual ██████████ ±₩1.500M quality issue ████████ ±₩1.200M change ██████ ±₩0.800M → exchange Korean number → management ``` ## risk etc.recorddepartment template | ID | risk | category | probability | impact | score | etc.grade | response | responsible | status | |----|--------|---------|------|------|------|------|------|------|------| | R01 | [description] | technical | 4 | 5 | 20 | 🔴 | mitigation | [name] | nature | | R02 | [description] | management | 3 | 3 | 9 | 🟡 | acceptance | [name] | monitoring | ## KRI (Key Risk Indicator) design | KRI | total | cycle | | |-----|--------|----------|--------| | schedule SPI | <0.9 | weekbetween | schedule risk re-assessment | | cost CPI | <0.9 | monthbetween | budget risk re-assessment | | rate | >5% | sprint | quality risk re-assessment | | rate | >15% | monthbetween | personcapability risk re-assessment | ## quality checklist | item | standard | |------|------| | matrix | 5x5 probability-impact applied | | category | RBS 4versus category | | analysis | EMV or scenario analysis | | KRI | risk 1items or more | | etc.grade standard | 4stage | | cycle | risk re-assessment schedule specify |
Excerpt, first 3,600 characters of SKILL.md, verbatim from the audited commit. It is text from someone else’s repository, quoted so you can judge it before your agent reads it.
Install
Pinned to the audited commit 459e1bb
git clone https://github.com/revfactory/harness-100 git -C harness-100 checkout 459e1bb8f76e
The author documents no install command, so this uses the repository directly. Our verdict covers commit 459e1bb8f76e only.
Works in
The author has not said which agents this skill supports, and we have not tested it in any.
Audit history
Every audit, every source change
- ✓SAFE B 89 / 100
first audit · source
459e1bb8f76e
README badge
For maintainers · shows the latest audit
[](https://modelsatlas.com/skills/revfactory/risk-scoring-matrix/)
The badge shows our verdict and grade for this skill, and links back to this page. It changes when the audit does.
Similar skills
mattpocock/skills
Implement a piece of work based on a spec or set of tickets.
mattpocock/skills
Compact the current conversation into a handoff document for another agent to pick up.
mattpocock/skills
Pursue a long-running goal in a single session by co-ordinating subagents.
Add this badge to your README
[](https://modelsatlas.com/skills/revfactory/risk-scoring-matrix/)
<a href="https://modelsatlas.com/skills/revfactory/risk-scoring-matrix/"><img src="https://modelsatlas.com/skills/revfactory/risk-scoring-matrix/badge.svg" alt="ModelsAtlas: SAFE B"></a>
Questions about Risk Scoring Matrix
Is Risk Scoring Matrix safe to install?
What can Risk Scoring Matrix access on my machine?
How current is this page?
Sources
- github.com/revfactory/harness-100/tree/main/en/88-risk-register/ — the audited source at commit 459e1bb8f76e and every finding aboveObserved · 12 Oct 2026
Spotted something wrong? Report a correction · Methodology
Keep going in your AI
Opens with this page as the source. We add nothing else to the prompt.
- Is Risk Scoring Matrix safe to install?
- What can Risk Scoring Matrix access on my machine?
- How current is this page?