Decision FrameworksSAFE
Overview
An agent skill published by revfactory.
459e1bb8f76eOBSERVED · 2026-10-12What it tells the agent
The instruction file, verbatim from the audited commit — this is the text the model reads, and the surface the audit's instruction layer examines. Quoted here so you can judge it without cloning anything.
--- name: decision-frameworks description: "decision-making framework library. framework-designer agent meeting decision-making structure designto do when reference. 'decision-making matrix', 'DACI', 'option assessment' request when usage. However, actual table whensystem decision-making specialist tool building scope outside." --- # Decision Frameworks — decision-making framework library framework-designer agent decision-making structure design framework . ## decision-making typeby framework mapping | decision-making type | also | recommendation framework | quality meeting | |-------------|--------|---------------|----------| | specialistday | Low | | 10minute | | during option optional | duringbetween | during assessment matrix | 30minute decision-making | | strategyquality direction | High | DACI + scenario | 60minute strategy meeting | | specialistKRW allocation | High | priority matrix | minutebasis plan | | risk judgment | High | expected analysis | KRW reporting | ## DACI framework | role | description | personKRW | |------|------|------| | **D**river | decision-making process week also | 1people | | **A**pprover | final person | 1people | | **C**ontributor | /information provide | Npeople | | **I**nformed | result report target | Npeople | ### DACI document template ```markdown ## decision-making: [title] - deadline: 2025-01-31 - Driver: [name/] - Approver: [name/] - Contributors: [name list] - Informed: [name list] ### background [ decision neededKorean] ### option | option | description | advantage | disadvantage | cost | schedule | |------|------|------|------|------|------| | A | ... | ... | ... | ... | ... | | B | ... | ... | ... | ... | ... | ### plan [Driver and basis] ### decision [Approver final decision] — daywhen: ____ ``` ## during assessment matrix (Weighted Scoring) ### design procedure ``` 1. assessment standard (5~7items) 2. duringvalue to do (total 100%) 3. each option standardby 1~5point assessment 4. during score = score × duringvalue 5. totalpoint comparison → point option optional ``` ### template | standard | duringvalue | option A | option B | option C | |------|--------|--------|--------|--------| | cost | 30% | 4 (1.2) | 3 (0.9) | 5 (1.5) | | implementation difficulty | 25% | 3 (0.75) | 5 (1.25) | 2 (0.5) | | strategy qualitynature | 25% | 5 (1.25) | 3 (0.75) | 4 (1.0) | | risk | 20% | 4 (0.8) | 4 (0.8) | 3 (0.6) | | **totalpoint** | **100%** | **4.0** | **3.7** | **3.6** | ## 2x2 priority matrix ### Eisenhower matrix ``` grade High Low ┌───────────┬───────────┐ │ DO NOW │ SCHEDULE │ │ i.e.when execution │ schedule establish │ ├───────────┼───────────┤ during│ DELEGATE │ ELIMINATE│ │ │ │ ├───────────┴───────────┤ │ │ │ │ └───────────────────────┘ ``` ### Impact-Effort matrix | | capability Low | capability High | |---|---------|---------| | ** High** | Quick Win (i.e.when) | Major Project (plan) | | ** Low** | Fill-in ( when) | Thankless Task (basis) | ## expected analysis (Expected Value) ``` expected = Σ (result × probability) option A: nature(70%): +5000,000 KRW → 3500,000 KRW failure(30%): -2000,000 KRW → -600,000 KRW expected: +2900,000 KRW option B: nature(90%): +2000,000 KRW → 1800,000 KRW failure(10%): -500,000 KRW → -50,000 KRW expected: +1750,000 KRW → expected standard option A optional → However, risk also option B optional (versus loss ) ``` ## derive method | method | description | quality situation | |------|------|----------| | Fist of Five | 1~5 when tablewhen | confirm | | Dot Voting | eachspecialist allocation | number option | | Roman Voting | 👍/👎/✊ when | confirm | | Gradients of Agreement | 8stage | un-Korean gap | | Decision Sprint | debate+table | time limitation | ## quality checklist | item | standard | |------|------| | role | DACI or etc. role | | assessment standard | companybefore done standard 5~7items | | option number | 2~5items (exceeding when companybefore ) | | data basis | each option quality basis | | method | companybefore done method | | deadline | decision-making person specify |
Trust audit
SAFEgrade B · trust 89/100 Nothing in the source contradicts what it says it does. Grade A is reserved for packages that have also passed the behavioural sandbox.
| Layer | What it checks | Result |
|---|---|---|
| L0 | Provenance & inventory | PASS |
| L1 | Static analysis of the code | NA |
| L2 | Instruction surface (what it tells the agent) | PASS |
| L3 | Class-specific surface | PASS |
| L4 | Behavioural (sandbox) | SKIPPED |
What the source does
- Filesystem
- none-observed
- Network
- none-observed
- Shell
- none-observed
- Dependencies
- pinned
- Secrets in source
- none-found
Findings (0)
No findings outside the package's declared scope.
Gates applied: no_behavioural_pass.
459e1bb8f76efull audit observations/trust-audit/skill/revfactory__decision-frameworks.json · Report an issue / request a re-scanAudit history
Every audit this skill has had.
| Date | Source | Verdict | Grade | Score | Change |
|---|---|---|---|---|---|
| 2026-10-12 | 459e1bb8f76e | SAFE | B | 89 | first audit |
Questions
Is Decision Frameworks safe to install?
The audit found nothing in the source that contradicts what it says it does, and graded it B (89/100). Grade A is held back for packages that have also passed a sandboxed behavioural run, which is why a clean skill reads B.
What can Decision Frameworks access on my machine?
The audit observed no filesystem, network or shell use at all in its source.
How current is this page?
The grade is for one exact copy of the source (459e1bb8f76e), read on 2026-10-12. The repository is watched, and a new audit runs when it changes — this is the first audit.