Compound Interest SimulatorSAFE
Overview
An agent skill published by revfactory.
459e1bb8f76eOBSERVED · 2026-10-12What it tells the agent
The instruction file, verbatim from the audited commit — this is the text the model reads, and the surface the audit's instruction layer examines. Quoted here so you can judge it without cloning anything.
--- name: compound-interest-simulator description: " and simulation and basis asset nature example tool. 'investment-advisor' and 'tax-strategist' agent investment revenue simulationand retirement specialist designto do when this skill's official, scenario comparison, retirement goal total must be utilized. ' total', 'asset nature example', 'retirement specialist simulation' etc. However, budget design tax total is outside this skill's scope." --- # Compound Interest Simulator — simulator and simulation, asset nature example, retirement specialist total. ## core official ### daywhen ``` FV = PV × (1 + r)^n FV: un- value (Future Value) PV: current value (Present Value) r: annual revenuerate (number) n: duration (year) examplewhen: 1,0000,000 KRW annual 7% 30year investment FV = 1,000 only × (1.07)^30 = 7,6120,000 KRW ``` ### basis quality (month) ``` FV = PMT × [(1 + r/12)^(12n) - 1] / (r/12) PMT: month quality r: annual revenuerate n: duration (year) examplewhen: month 500,000 KRW annual 7% 20year quality FV = 50 only × [(1.00583)^240 - 1] / 0.00583 = 50 only × 520.9 = 200M 6,0450,000 KRW (KRW 100M 2,0000,000 KRW, revenue 100M 4,0450,000 KRW) ``` ### retirement specialist (needed month quality) ``` PMT = FV × (r/12) / [(1 + r/12)^(12n) - 1] examplewhen: 20year after 500M needed, annual 7% expectedrevenue PMT = 500M × 0.00583 / [(1.00583)^240 - 1] = 500M × 0.00192 = 95.90,000 KRW/month ``` ## 72 (asset 2 duration) ``` asset 2 annualnumber ≈ 72 / annual revenuerate(%) annual revenuerateby 2 duration: 3%: 24year 5%: 14.4year 7%: 10.3year 10%: 7.2year 12%: 6year 15%: 4.8year ``` ## asset by expectedrevenuerate | asset | annual expectedrevenuerate | nature(tablelevelgap) | nature | |------|-------------|---------------|------| | example/quality | 3-4% | 0% | KRW report, person less than | | | 3-5% | 3-5% | planquality, total | | (company) | 4-7% | 5-8% | within revenue | | week(within) | 7-10% | 15-20% | basis nature, | | week | 7-10% | 14-18% | minute | | week | 8-12% | 20-25% | nature·risk | | department | 5-8% | 10-15% | dividend+whentaxgap | | | 3-6% | 15-20% | person degree | ## scenario comparison simulation ### annual revenuerate gap impact (month 1000,000 KRW, 30year) | annual revenuerate | total KRW | final asset | revenue | revenuerate(total) | |----------|---------|----------|------|-----------| | 3% | 3.600M | 5.800M | 2.200M | 61% | | 5% | 3.600M | 8.300M | 4.700M | 131% | | 7% | 3.600M | 12.200M | 8.600M | 239% | | 10% | 3.600M | 22.600M | 19.000M | 528% | ### whenwork timing gap impact (month 500,000 KRW, annual 7%) | whenwork | investment duration | KRW | final asset | notes | |----------|----------|------|----------|------| | 25tax | 35year | 2.100M | 10.800M | day whenwork | | 30tax | 30year | 1.800M | 6.100M | 5year gap -4.700M | | 35tax | 25year | 1.500M | 4.100M | | | 40tax | 20year | 1.200M | 2.600M | | ## retirement design total ### retirement specialist needed calculation ``` month × 12 × retirement after duration(year) × person reportnumberquality total (person 3%, investmentrevenue 5%): actual revenuerate = 5% - 3% = 2% 25year retirement , month 3000,000 KRW needed when: needed specialist = 300 only × 12 / 0.02 × [1 - (1.02)^(-25)] ≈ 7.000M KRW 4% person rule (between): retirement specialist = annualbetween / 0.04 = 3,6000,000 KRW / 0.04 = 9.000M KRW ``` ### pension number reflected ``` done needed specialist = total needed specialist - pension current pension expected number (2024 standard, 20year ): month pyeongbalanced 3000,000 KRW → month approx. 60-800,000 KRW month pyeongbalanced 5000,000 KRW → month approx. 100-1200,000 KRW gap itemsperson assetas preparation ``` ## simulation capability ```markdown ## asset nature simulation **initial investment**: X0,000 KRW | **month quality**: X0,000 KRW | **expected revenuerate**: X% **investment duration**: Xyear | annualgap | KRW total | asset value | revenue | revenuerate | |------|----------|----------|------|--------| | 5year | X0,000 KRW | X0,000 KRW | X0,000 KRW | X% | | 10year | X0,000 KRW | X0,000 KRW | X0,000 KRW | X% | | 15year | X0,000 KRW | X0,000 KRW | X0,000 KRW | X% | | 20year | X0,000 KRW | X0,000 KRW | X0,000 KRW | X% | | 30year | X0,000 KRW | X0,000 KRW | X0,000 KRW | X% | **core insight**: [ and degree timing, tax savings utilization when addition and etc.] ``` ## reference - revenuerate un- reportdegree - detailed simulation model: `references/simulation-models.md` reference
Trust audit
SAFEgrade B · trust 89/100 Nothing in the source contradicts what it says it does. Grade A is reserved for packages that have also passed the behavioural sandbox.
| Layer | What it checks | Result |
|---|---|---|
| L0 | Provenance & inventory | PASS |
| L1 | Static analysis of the code | NA |
| L2 | Instruction surface (what it tells the agent) | PASS |
| L3 | Class-specific surface | PASS |
| L4 | Behavioural (sandbox) | SKIPPED |
What the source does
- Filesystem
- none-observed
- Network
- none-observed
- Shell
- none-observed
- Dependencies
- pinned
- Secrets in source
- none-found
Findings (0)
No findings outside the package's declared scope.
Gates applied: no_behavioural_pass.
459e1bb8f76efull audit observations/trust-audit/skill/revfactory__compound-interest-simulator.json · Report an issue / request a re-scanAudit history
Every audit this skill has had.
| Date | Source | Verdict | Grade | Score | Change |
|---|---|---|---|---|---|
| 2026-10-12 | 459e1bb8f76e | SAFE | B | 89 | first audit |
Questions
Is Compound Interest Simulator safe to install?
The audit found nothing in the source that contradicts what it says it does, and graded it B (89/100). Grade A is held back for packages that have also passed a sandboxed behavioural run, which is why a clean skill reads B.
What can Compound Interest Simulator access on my machine?
The audit observed no filesystem, network or shell use at all in its source.
How current is this page?
The grade is for one exact copy of the source (459e1bb8f76e), read on 2026-10-12. The repository is watched, and a new audit runs when it changes — this is the first audit.