Agent skill · Audited from source

Tool Design Sprint Test And Score

skill · product-on-purpose/pm-skillsApache-2.0 licenceAudited 19 Oct 2026 · source 2abfbb961d31

★ 741pushed 1 day agoversion 1.0.0
✓SAFEGrade B · 89/100 · 19 Oct 2026 · 2abfbb9
741repo stars · whole product-on-purpose/pm-skills

Is it safe? Yes — SAFE, grade B (89/100). We read this skill's source at commit 2abfbb961d31 and found no filesystem, network or shell access and no hard-coded secrets. What it does: Day 5 (Friday) sprint-closing move of a Design Sprint that produces the bundled Friday artifact covering per-customer interview observations, best quotes, scorecard grid (sprint questions by customers), observed…

Ask an AI about this pageGChatGPTCClaudePPerplexityGeGeminiXGrok
More
Cite

Cite this page

ModelsAtlas. “Tool Design Sprint Test And Score (product-on-purpose/pm-skills)”. Retrieved 19 Oct 2026. https://modelsatlas.com/skills/product-on-purpose/tool-design-sprint-test-and-score

Trust audit

Audit 0.4.1 · source read 19 Oct 2026

Trust score89/100✓SAFE B
0 critical0 high0 medium0 low0 info

SAFE means nothing in the source contradicts what the skill says it does. Grade B is shared by 13,985 of 14,816 audited skills.

What the source does

  • FilesystemNone observedNo reads or writes in the source
  • NetworkNone observedNo outbound calls in the source
  • ShellNone observedNo commands run in the source
  • DependenciesPinnedNothing floats
  • SecretsNone foundNo keys in source

Five audit layers

LayerWhat we checkResultFindings
L0 ProvenanceRepo owner, licence, archive status, activityPASS0
L1 Static sourceSecrets, path traversal, supply chain, hidden codeNA0
L2 InstructionsPrompt injection, authority framing, hidden directivesPASS0
L3 InventoryThe files and declarations match the sourcePASS0
L4 SandboxRun in isolation and watch behaviourSKIPPED why0

Gates applied: no behavioural pass.

Findings (0)

No findings at any severity. We re-audit when the source changes.

Audit 0.4.1 · source sha 2abfbb961d31 · 19 Oct 2026Report an issue or request a re-scan

Provenance

Who published it, and what the verdict is pinned to

  • Publisherproduct-on-purpose GitHub organizationOwner of the repository this skill is read from
  • Source folderproduct-on-purpose/pm-skills/skills/tool-design-sprint-test-and-scoreThe exact folder we audited
  • LicenceApache-2.0As the repository states it
  • Commit pinned for this verdict2abfbb961d31A new audit runs when the source changes
  • Repository statusNot archivedLast push 1 day ago
  • Sandboxed runNot runSkills are read, not executed; layer L4 is skipped

What it tells the agent

Full source on GitHub ↗

Its description: Day 5 (Friday) sprint-closing move of a Design Sprint that produces the bundled Friday artifact covering per-customer interview observations, best quotes, scorecard grid (sprint questions by customers), observed…

---
name: tool-design-sprint-test-and-score
description: Day 5 (Friday) sprint-closing move of a Design Sprint that produces the bundled Friday artifact covering per-customer interview observations, best quotes, scorecard grid (sprint questions by customers), observed patterns, hot takes from each team member, and the Decider summary (build, iterate, pivot, or stop, plus highest-confidence learning, most important revision, and next artifact). Use Friday after Thursday's prototype passes trial run and during/after the 5 customer interviews. The sprint's payoff artifact.
license: Apache-2.0
metadata:
  classification: tool
  version: "1.0.0"
  updated: 2026-07-04
  tool: design-sprint
  move: test-and-score
  category: discovery
  frameworks:
    - design-sprint
    - sprint
  timebox_minutes: 270
  roles:
    - facilitator
    - researcher
    - decider
    - pm
    - design
    - engineering
  prerequisites:
    - tool-design-sprint-prototype-plan
  inputs:
    - prototype (built Thursday; NOT produced by this skill)
    - interview script (from tool-design-sprint-prototype-plan)
    - sprint questions (from Monday's map-and-target)
    - founding hypothesis (optional; from a prior Foundation Sprint)
    - participant schedule
  outputs:
    - per-customer interview observation notes
    - best quotes
    - scorecard grid
    - observed patterns
    - hot takes
    - decider summary
  author: product-on-purpose
---

<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->

# Design Sprint Test and Score (Friday)

Friday is the sprint's payoff. 5 target-profile customers run the prototype while the team observes; the team synthesizes observations into a scorecard against the sprint questions; the Decider makes the build / iterate / pivot / stop call by end-of-day. The week's 35-40 person-days plus customer recruiting cost converts into one actionable decision.

Family contract: [`docs/reference/skill-families/design-sprint-skills-contract.md`](../../docs/reference/skill-families/design-sprint-skills-contract.md). This skill is a member of `design-sprint-skills`.

## When to Use

- It is Day 5 of the Design Sprint and Thursday's prototype passed trial run.
- 5 confirmed participants are scheduled (canonical; or 4 if 1 cancelled-and-no-buffer; pause if below 4).
- The team can observe interviews live (in-person or via Zoom breakout room) and synthesize during the day.
- The Decider is present Friday PM for the post-interview review (canonically 14:00-18:00 PT window covering observation of slots 4-5 plus Decider review by 17:30 PT).

## When NOT to Use

- Thursday prototype did not pass trial run. Re-run trial; if still failing at 19:00 PT Thursday, postpone Friday.
- Fewer than 3 customers confirmed. Per Ratified Decision 3, the canonical guidance is 5 customers; 3-4 or 6-7 gets a documented warning; below 3 or above 7 should trigger a re-decision (postpone or split testing). Note: the v0.1.0 family validator does NOT mechanically enforce these thresholds (cohort count is in the EXAMPLE artifact, not in frontmatter); enforcement is a v2.16 validator-expansion candidate.
- Decider unavailable for the post-interview review window. Without Decider, the day produces observations without a call.
- The team plans to use this skill to write the executive memo. Per Ratified Decision 4: exec memo authoring is delegated to `foundation-stakeholder-update` (existing pm-skills foundation skill); this skill produces the Decider summary only.

## What This Skill Produces

A single bundled artifact with six sections:

1. **Per-customer interview observation notes**: one section per customer; covers Context (Act 2) reactions, Tasks (Act 4) behavior with timestamps, Debrief (Act 5) reactions including pricing. Captured live during the day's interviews.
2. **Best quotes**: 5-15 verbatim customer quotes the team flags as most signal-bearing. Used in the Decider summary and in any downstream pitch or planning artifact.
3. **Scorecard grid**: rows are the sprint questions (from Monday); columns are the 5 customers; each cell is Y / N / partial / unclear with a one-line note; rightmost column is the team's day-end decision per question (Validated / Invalidated / Inconclusive).
4. **Observed patterns**: 4 buckets (worked, hesitated, broke trust, unexpected) with 2-4 patterns per bucket. Each pattern names how many customers showed it.
5. **Hot takes**: one short paragraph per team member capturing their personal read on Friday before group synthesis biases the read. Written silently in parallel.
6. **Decider summary**: the Decider's call (build / iterate / pivot / stop / reframe) plus the highest-confidence learning, the most important revision the team would make to the prototype direction, and the next artifact the team will produce (the post-sprint deliverable).

See `references/TEMPLATE.md` for the canonical structure and `references/EXAMPLE.md` for the Brainshelf book-catalog Friday artifact.

## Friday Time Structure

Friday is the longest day: customer interviews start early (canonically 09:00 PT) and the Decider review concludes the day (canonically 17:30 PT).

- **09:00-16:30**: 5 customer interviews of 50-60 minutes each at 09:00 / 10:30 / 12:00 / 14:00 / 15:30. Each slot: 10 min setup + 50-55 min interview + 5 min team huddle to capture observations before next customer.
- **13:00-14:00**: Lunch (slot 3 wraps ~13:00; lunch overlaps the slot 3 to slot 4 buffer)
- **16:30-16:45**: Last-customer wrap; observation note tidy
- **16:45-17:00**: Team writes hot takes silently in parallel
- **17:00-17:30**: Decider reviews scorecard + hot takes; makes the call
- **17:30-18:00**: Decider summary captured; team begins post-sprint disposition (next-step calendar, downstream deliverable assignment)

This skill's 270-minute timebox covers the synthesis sections (scorecard, patterns, hot takes, Decider summary). The 5 interviews themselves (~5 hours of interview time) run in parallel with c

Excerpt, first 6,000 characters of SKILL.md, verbatim from the audited commit. It is text from someone else’s repository, quoted so you can judge it before your agent reads it.

Install

Pinned to the audited commit 2abfbb9

Download folder ↗
git clone https://github.com/product-on-purpose/pm-skills
git -C pm-skills checkout 2abfbb961d31

The author documents no install command, so this uses the repository directly. Our verdict covers commit 2abfbb961d31 only.

Works in

The author has not said which agents this skill supports, and we have not tested it in any.

Audit history

Every audit, every source change

  1. ✓SAFE B 89 / 100

    first audit · source 2abfbb961d31

Define Prioritization Framework✓SAFE

product-on-purpose/pm-skills

Run applicable prioritization frameworks (RICE, ICE, MoSCoW, Weighted Scoring, Kano) against a list of features or initiatives. Produces a comparison table showing where rankings agree and diverge across frameworks, and…

★ 741Grade B
Deliver Acceptance Criteria✓SAFE

product-on-purpose/pm-skills

Generates structured Given/When/Then acceptance criteria for a user story or feature slice, covering the happy path, key failure scenarios, and non-functional expectations in testable form. Use when turning requirements…

★ 741Grade B
Discover Journey Map✓SAFE

product-on-purpose/pm-skills

Maps a customer journey across stages, touchpoints, emotional curve, pain points, and moments of truth into a markdown artifact with an optional mermaid timeline or flowchart. Use when synthesizing existing research…

★ 741Grade B
Discover Market Sizing✓SAFE

product-on-purpose/pm-skills

Estimate market opportunity (TAM, SAM, SOM) using multiple sizing frameworks (top-down, bottom-up, comparable company, analogous market). Triangulates across frameworks, highlights where they converge and diverge as…

★ 741Grade B
Efforts✓SAFE

product-on-purpose/pm-skills

68 plug-and-play, best-practice product management skills for AI agents: 30 Triple Diamond phase + 11 foundation + 12 utility + 15 tool (Foundation Sprint + Design Sprint). Plus 6 sub-agents, workflows, 200+ output…

★ 741Grade B
Foundation Lean Canvas✓SAFE

product-on-purpose/pm-skills

Produces a one-page lean canvas across nine interlocking blocks (problem, customer, UVP, solution, channels, revenue, cost, metrics, unfair advantage) with optional inline HTML and SVG visual rendering. Use when framing…

★ 741Grade B

Questions about Tool Design Sprint Test And Score

What does the Tool Design Sprint Test And Score skill do?
68 plug-and-play, best-practice product management skills for AI agents: 30 Triple Diamond phase + 11 foundation + 12 utility + 15 tool (Foundation Sprint + Design Sprint). Plus 6 sub-agents, workflows, 200+ output samples, guides, and CI-enforced contracts. Apache 2.0.
Is Tool Design Sprint Test And Score safe to install?
The audit found nothing in the source that contradicts what it says it does, and graded it B (89/100). Grade A is held back for packages that have also passed a sandboxed behavioural run, which is why a clean skill reads B.
What can Tool Design Sprint Test And Score access on my machine?
The audit observed no filesystem, network or shell use at all in its source.
How current is this page?
The grade is for one exact copy of the source (2abfbb961d31), read on 2026-10-19. The repository is watched, and a new audit runs when it changes — this is the first audit.

Sources

Spotted something wrong? Report a correction · Methodology

Keep going in your AI

Opens with this page as the source. We add nothing else to the prompt.