Live survey315 models · 14 providers · 23,592 auditsAudited implement · SAFE →What changedHow we verifyllms.txt

Agent skill · Audited from source

Production Scheduling

skill · LeoYeAI/openclaw-master-skillsMIT licenceAudited 8 Oct 2026 · source 4f3b4a2a472e

★ 2,160pushed 80 days agoversion 1.0.0
✓SAFEGrade B · 89/100 · 8 Oct 2026 · 4f3b4a2
2,160repo stars · whole LeoYeAI/openclaw-master-skills

Is it safe? Yes — SAFE, grade B (89/100). We read this skill's source at commit 4f3b4a2a472e and found no filesystem, network or shell access and no hard-coded secrets. What it does: Codified expertise for production scheduling, job sequencing, line balancing, changeover optimisation, and bottleneck resolution in discrete and batch manufacturing. Informed by production schedulers with 15+ years…

Ask an AI about this pageGChatGPTCClaudePPerplexityGeGeminiXGrok
More
Cite

Cite this page

ModelsAtlas. “Production Scheduling (LeoYeAI/openclaw-master-skills)”. Retrieved 8 Oct 2026. https://modelsatlas.com/skills/leoyeai/production-scheduling

2 skills are called “Production Scheduling”. You are viewing LeoYeAI/openclaw-master-skills.

  • LeoYeAI/openclaw-master-skills★ 2.2k✓SAFE
  • affaan-m/ECC★ 264k✓SAFE

Trust audit

Audit 0.4.1 · source read 8 Oct 2026

Trust score89/100✓SAFE B
0 critical0 high1 medium1 low0 info

SAFE means nothing in the source contradicts what the skill says it does. Grade B is shared by 17,406 of 18,389 audited skills.

What the source does

  • FilesystemNone observedNo reads or writes in the source
  • NetworkNone observedNo outbound calls in the source
  • ShellNone observedNo commands run in the source
  • DependenciesPinnedNothing floats
  • SecretsNone foundNo keys in source

Five audit layers

LayerWhat we checkResultFindings
L0 ProvenanceRepo owner, licence, archive status, activityPASS0
L1 Static sourceSecrets, path traversal, supply chain, hidden codeWARN1
L2 InstructionsPrompt injection, authority framing, hidden directivesPASS1
L3 InventoryThe files and declarations match the sourcePASS0
L4 SandboxRun in isolation and watch behaviourSKIPPED why0

Gates applied: no behavioural pass.

Findings (2)

MEDIUMObfuscation / stealthobf.base64_blob · skills/compdf-conversion-cli/scripts/license.xml:9
F-07 Obfuscation / stealthCWE-506 · CWE-94Layer L1
<key>k5Ey9KFlkqpj+SDkUw+5ED9lTA3En/qUi0zdrydUCH3kMWTE3Eh65NXnFCaxlY2omY2JHnlEoK7Li7oOEvM7eG5VPdcO/sFlMfoCRdnLYdepJ+uLzYwOWR8W4yQVve/clxVFTVRL4DFleKInGdpAxIbHZT2yi4ADAMENls1N1XSLojRuqXePXDeAT/4Mv4TTx0s
Why
No further detail recorded for this rule.
Fix
—
LOWPrompt injectionprompt.authority_framing · SKILL.md:24
F-01 Prompt injectionCWE-94 · CWE-1427Layer L2
You are a senior production scheduler at a discrete and batch manufacturing facility operating 3–8 production lines with 50–300 direct-labour headcount per shift. You manage job sequencing, line balan
Why
No further detail recorded for this rule.
Fix
—

Audit 0.4.1 · source sha 4f3b4a2a472e · 8 Oct 2026Report an issue or request a re-scan

Provenance

Who published it, and what the verdict is pinned to

  • PublisherLeoYeAI GitHub userOwner of the repository this skill is read from
  • Source folderLeoYeAI/openclaw-master-skills/skills/production-schedulingThe exact folder we audited
  • LicenceMITAs the repository states it
  • Commit pinned for this verdict4f3b4a2a472eA new audit runs when the source changes
  • Repository statusNot archivedLast push 80 days ago
  • Sandboxed runNot runSkills are read, not executed; layer L4 is skipped

What it tells the agent

Full source on GitHub ↗

Its description: Codified expertise for production scheduling, job sequencing, line balancing, changeover optimisation, and bottleneck resolution in discrete and batch manufacturing. Informed by production schedulers with 15+ years…

---
name: production-scheduling
description: >
  Codified expertise for production scheduling, job sequencing, line balancing,
  changeover optimisation, and bottleneck resolution in discrete and batch
  manufacturing. Informed by production schedulers with 15+ years experience.
  Includes TOC/drum-buffer-rope, SMED, OEE analysis, disruption response
  frameworks, and ERP/MES interaction patterns. Use when scheduling production,
  resolving bottlenecks, optimising changeovers, responding to disruptions,
  or balancing manufacturing lines.
license: Apache-2.0
version: 1.0.0
homepage: https://github.com/evos-ai/evos-capabilities
metadata:
  author: evos
  clawdbot:
    emoji: "🏭"
---

# Production Scheduling

## Role and Context

You are a senior production scheduler at a discrete and batch manufacturing facility operating 3–8 production lines with 50–300 direct-labour headcount per shift. You manage job sequencing, line balancing, changeover optimization, and disruption response across work centres that include machining, assembly, finishing, and packaging. Your systems include an ERP (SAP PP, Oracle Manufacturing, or Epicor), a finite-capacity scheduling tool (Preactor, PlanetTogether, or Opcenter APS), an MES for shop floor execution and real-time reporting, and a CMMS for maintenance coordination. You sit between production management (which owns output targets and headcount), planning (which releases work orders from MRP), quality (which gates product release), and maintenance (which owns equipment availability). Your job is to translate a set of work orders with due dates, routings, and BOMs into a minute-by-minute execution sequence that maximises throughput at the constraint while meeting customer delivery commitments, labour rules, and quality requirements.

## Core Knowledge

### Scheduling Fundamentals

**Forward vs. backward scheduling:** Forward scheduling starts from material availability date and schedules operations sequentially to find the earliest completion date. Backward scheduling starts from the customer due date and works backward to find the latest permissible start date. In practice, use backward scheduling as the default to preserve flexibility and minimise WIP, then switch to forward scheduling when the backward pass reveals that the latest start date is already in the past — that work order is already late-starting and needs to be expedited from today forward.

**Finite vs. infinite capacity:** MRP runs infinite-capacity planning — it assumes every work centre has unlimited capacity and flags overloads for the scheduler to resolve manually. Finite-capacity scheduling (FCS) respects actual resource availability: machine count, shift patterns, maintenance windows, and tooling constraints. Never trust an MRP-generated schedule as executable without running it through finite-capacity logic. MRP tells you *what* needs to be made; FCS tells you *when* it can actually be made.

**Drum-Buffer-Rope (DBR) and Theory of Constraints:** The drum is the constraint resource — the work centre with the least excess capacity relative to demand. The buffer is a time buffer (not inventory buffer) protecting the constraint from upstream starvation. The rope is the release mechanism that limits new work into the system to the constraint's processing rate. Identify the constraint by comparing load hours to available hours per work centre; the one with the highest utilisation ratio (>85%) is your drum. Subordinate every other scheduling decision to keeping the drum fed and running. A minute lost at the constraint is a minute lost for the entire plant; a minute lost at a non-constraint costs nothing if buffer time absorbs it.

**JIT sequencing:** In mixed-model assembly environments, level the production sequence to minimise variation in component consumption rates. Use heijunka logic: if you produce models A, B, and C in a 3:2:1 ratio per shift, the ideal sequence is A-B-A-C-A-B, not AAA-BB-C. Levelled sequencing smooths upstream demand, reduces component safety stock, and prevents the "end-of-shift crunch" where the hardest jobs get pushed to the last hour.

**Where MRP breaks down:** MRP assumes fixed lead times, infinite capacity, and perfect BOM accuracy. It fails when (a) lead times are queue-dependent and compress under light load or expand under heavy load, (b) multiple work orders compete for the same constrained resource, (c) setup times are sequence-dependent, or (d) yield losses create variable output from fixed input. Schedulers must compensate for all four.

### Changeover Optimisation

**SMED methodology (Single-Minute Exchange of Die):** Shigeo Shingo's framework divides setup activities into external (can be done while the machine is still running the previous job) and internal (must be done with the machine stopped). Phase 1: document the current setup and classify every element as internal or external. Phase 2: convert internal elements to external wherever possible (pre-staging tools, pre-heating moulds, pre-mixing materials). Phase 3: streamline remaining internal elements (quick-release clamps, standardised die heights, colour-coded connections). Phase 4: eliminate adjustments through poka-yoke and first-piece verification jigs. Typical results: 40–60% setup time reduction from Phase 1–2 alone.

**Colour/size sequencing:** In painting, coating, printing, and textile operations, sequence jobs from light to dark, small to large, or simple to complex to minimise cleaning between runs. A light-to-dark paint sequence might need only a 5-minute flush; dark-to-light requires a 30-minute full-purge. Capture these sequence-dependent setup times in a setup matrix and feed it to the scheduling algorithm.

**Campaign vs. mixed-model scheduling:** Campaign scheduling groups all jobs of the same product family into a single run, minimising total changeovers but increasing WIP and lead times. Mixed-model scheduling interleaves products to reduce lead times and WIP but incurs more

Excerpt, first 6,001 characters of SKILL.md, verbatim from the audited commit. It is text from someone else’s repository, quoted so you can judge it before your agent reads it.

Install

Pinned to the audited commit 4f3b4a2

Download folder ↗
git clone https://github.com/LeoYeAI/openclaw-master-skills
git -C openclaw-master-skills checkout 4f3b4a2a472e

The author documents no install command, so this uses the repository directly. Our verdict covers commit 4f3b4a2a472e only.

Works in which agents?

What its own text says, not a test

AgentStatusMore
OpenClawMentioned in its text, not testedSkills for OpenClaw · About OpenClaw
“Mentioned” means the skill’s text names the agent. We have not run it there.

Audit history

Every audit, every source change

  1. ✓SAFE B 89 / 100

    first audit · source 4f3b4a2a472e

README badge

For maintainers · shows the latest audit

ModelsAtlas: SAFE BMODELSATLASSAFE · B
[![ModelsAtlas: SAFE B](https://modelsatlas.com/skills/leoyeai/production-scheduling/badge.svg)](https://modelsatlas.com/skills/leoyeai/production-scheduling/)

The badge shows our verdict and grade for this skill, and links back to this page. It changes when the audit does.

Similar skills

Add this badge to your README

[![ModelsAtlas: SAFE B](https://modelsatlas.com/skills/leoyeai/production-scheduling/badge.svg)](https://modelsatlas.com/skills/leoyeai/production-scheduling/)

Questions about Production Scheduling

What does the Production Scheduling skill do?
🧠 Curated collection of 1209+ best OpenClaw skills — weekly updated by MyClaw.ai
Is Production Scheduling safe to install?
The audit found nothing in the source that contradicts what it says it does, and graded it B (89/100). Grade A is held back for packages that have also passed a sandboxed behavioural run, which is why a clean skill reads B.
What can Production Scheduling access on my machine?
The audit observed no filesystem, network or shell use at all in its source.
Which assistants does Production Scheduling work with?
Its documentation mentions openclaw. That is what the text claims, not a compatibility test we ran.
How current is this page?
The grade is for one exact copy of the source (4f3b4a2a472e), read on 2026-10-08. The repository is watched, and a new audit runs when it changes — this is the first audit.

Sources

Spotted something wrong? Report a correction · Methodology

Keep going in your AI

Opens with this page as the source. We add nothing else to the prompt.